Main Points for Daiwa Manunggal Industrial Park
-
1Easy access to central Jakarta, airport, port and interchange
- ・about 30 km from center of Jakarta
- ・about 55 km from Soekarno-Hatta International Airport
- ・about 35 km from Port of Tanjung Priok
- ・directly connected to Cibitung Interchange on Jakarta-Cikampek Highway
- ・11km to central Bekasi
-
2Stable infrastructure supporting operations
- ・Electricity / Electricity supply by private power company PT Cikarang Listrindo.
- ・ Industrial Water / Supplied from nearest canal and treated at water treatment facility.
- ・Wastewater Treatment / Primary treatment at each factory, then further treatment at secondary treatment facility and discharged.
- ・Communication / Telephone lines provided via PT. Indonet.
- ・Gas / Natural gas supplied from state-owned company (PGN), and industrial gas supplied from private gas company (Air Liguide).
-
3Various facilities in industrial park
Business hotel, rental office, serviced apartment, Japanese restaurant, data center, supermarket, bank, police box, fire station, post office, gas station, technical high school, mosque, etc.
as of October 2017
Sections currently for sale
Section | Area(m2) |
---|---|
AE 7 | 50,000 |
RR 2-1 | 30,000 |
RR 9 | 10,000 |
RR 15 | 80,000 |
SS 2 | 20,000 |
I 10 | 70,000 |
Section | Area(m2) |
---|---|
B-2 | 14,000 |
C | 17,000 |
E | 50,000 |
H | 48,000 |
M-3 | 36,000 |
- *Available from about 5,000 m2 for sales section
Overview of Daiwa Manunggal Industrial Park
Total Development Area | about 1,350 ha (including planned site) |
---|---|
Address | West Cikarang, Bekasi Regency, West Java, Indonesia |
Power | Generation capacity 755 MW |
Industrial Water | 72,000 m3 / day |
Wastewater Treatment | 72,000 m3 / day |
Communication | Telephone Optical communication area |
Gas | Natural gas (supplied by state-owned company) Industrial gas (supplied by private gas company) |
Daiwa Manunggal Industrial Park is an industrial park developed by PT. Bekasi Fajar Industrial Estate, Tbk (listed company) invested in by Daiwa House and the Indonesian real estate development company PT. Argo Manunggal Land Development.
Local companies in cooperation with Daiwa House will support operations.
/// Daiwa Manunggal Industrial Park Vicinity Image
- Industrial park
- Industrial park
- ENSO Hotel
- Industrial park management office
- Industrial park practice golf course
- Industrial park
Rental Factory Guide
/// Advantages of rental factory
- 1: Possible rental from small area section of 1,000 m2
- 2: Early production start and entry with low initial investment
- 3: Fully equipped with Japanese-quality infrastructure
- 4:. Rental factory with safety and security of being managed by partner company
- Rental factory appearance
/// Rental space
Section | Factory(m2) | Note | |
---|---|---|---|
A-1 | 1792 | ||
A-2 | 2016 | ||
A-3 | 1008 | Occupied | |
B-1 | 1008 | ||
B-2 | 1008 | Occupied | |
B-3 | 1008 | Occupied | |
B-4 | 1008 | Occupied | |
B-5 | 1008 | Occupied |
/// Equipment / Specifications
Floor Load Capacity | Factory A | 2.0ton/m2 | ||
---|---|---|---|---|
Factory B | 1.5ton/m2 | |||
Planned Power | Unit | A-1 | 197KVA | 220V |
A-2 | 197KVA | 220V | ||
A-3 | 99KVA | 220V | ||
B-1 | 99KVA | 220V | ||
B-2 | 99KVA | 220V | ||
B-3 | 99KVA | 220V | ||
B-4 | 99KVA | 220V | ||
B-5 | 99KVA | 220V | ||
Plan Illumination | Factory | 200Lux or more | ||
Office | 500Lux or more | |||
Office Air Conditioning | Ceiling cassette air conditioners 4 | |||
Air conditioning capacity 4.5 KCAL / hx 4 |
/// Conditions
Deposit | 3 months of rent |
---|---|
Payment Schedule | Advance payment of 6 months of rent |
Contract Period | From 3 years |
Notification of Contract Extension | 3 months before end of rental period |
Contract Conditions after Extension | Consultation |
Rent Revision | Every year |
- *Consult for detailed conditions
Rental Warehouse Guide
/// Basic Specification Table
Items | TypeA 10,560m2 |
TypeB 5,312m2 |
---|---|---|
Building specifications | ||
1st floor warehouse area | 9,984m2 | 5,056m2 |
2nd floor water area (mezzanine) | 192m2 | ー |
1st floor office | 192m2 | 128m2 |
2nd floor office (air conditioning, lighting facilities separate) | 192m2 | 128m2 |
1st floor bathroom | ・ | ・ |
Floor load (1st floor warehouse area) | 3t/m2 | 3t/m2 |
Floor load (2nd floor warehouse area (mezzanine)) | 300kg/m2 | ー |
Floor load (1st floor, 2nd floor office area) | 300kg/m2 | 300kg/m2 |
Carry-in/out Vehicles Number of vehicles that can land at same time | 32 | 14 |
Effective height CH = 10,000 mm ~ CH = 13,000 mm | ・ | ・ |
Carry-in/out Vehicle Parking Spots | 16 | 8 |
Parking Lot | 10 | 5 |
Bicycle Parking | 160 | 80 |
Building facility specifications | ||
Warehouse Area Lighting | Mercury lamp 200 Lx | Mercury lamp 200 Lx |
Warehouse area skylight (installed in roof) |
・ | ・ |
Warehouse area air conditioning equipment | ー | ー |
Warehouse area dock levelers | 8 | 4 |
1st floor office lighting | 500Lx | 500Lx |
1st floor office air conditioning equipment:AC | ・ | ・ |
Capacitance | 300KVA | 150KVA |
Building Fire Equipment Specifications | ||
Indoor fire hydrant | ・ | ・ |
Outdoor fire hydrant | ・ | ・ |
Fire extinguisher (warehouse area) | ・ | ・ |
Fire extinguisher (office area) | ・ | ・ |
Fire alarm system | ・ | ・ |
Other | ||
Shared mosque | ・ | ・ |
Telephone Equipment | Arranged by tenant companies | Arranged by tenant companies |
Internet | Arranged by tenant companies | Arranged by tenant companies |
All Fixtures | Arranged by tenant companies | Arranged by tenant companies |
Loading/Unloading Costs for Checked Parcels | None | None |
Security Guards 24-hour security (site entrances and exits) | ・ | ・ |
Security facilities for each rental area | Arranged by tenant companies | Arranged by tenant companies |
Security facilities for each rental area | ・ | ・ |
Landlord Resident management staff | ・ | ・ |
/// Conditions
Deposit | 3 months of rent |
---|---|
Payment Schedule | Advance payment of 6 months of rent |
Contract Period | From 3 years |
Notification of Contract Extension | 3 months before end of rental period |
Contract Conditions after Extension | Consultation |
Rent Revision | Every year |
- *Consult for detailed conditions
Indonesia is the choice for companies expanding worldwide.
High economic growth is anticipated in Indonesia.
We are developing industrial parks that further expand business possibilities.
Indonesia has the largest territory and population among the 10 ASEAN countries. In recent years, the economy has also shown remarkable growth, achieving the highest GDP in ASEAN. It should be noted that the working age population accounts for approx. 67% of the total population. With an affluent workforce, it is also expected to be a potential consumer market.
POINT 1 Highest GDP in ASEAN with expected future economic growth
2014 GDP of major ASEAN countries
Source: IMF-World Economic Outlook (April 2015 version)
Change in Indonesian Nominal GDP (1980-2014)
Source: IMF-World Economic Outlook (April 2015 version)
POINT 2 Affluent workforce makes up about 67% of population,core of labor and consumption
Population pyramid
Source: Prepared by Eastspring Investments based on United Nations data (2010 expected values)
Population bonus length
Source: Published by the Cabinet Office (2011 edition)
POINT 3 Pro-Japanese country Over 1,700 Japanese companies have entered the market
World Pro-Japanese Survey
Source: BBC WORLD SERVICE (2010)
Local Japanese companies
※Sum may not total 100 due to rounding Source: ©TEIKOKU DATABANK, LTD. (as of June 19, 2015)
Inquiries
Daiwa House Industry Co., Ltd.
Tokyo Head Office Construction Business Division Representative: Yono
TEL.03-5214-2200
Daiwa House Industry Co., Ltd.
Head Office Construction Business Promotion Department Representative: Wakabayashi
TEL.06-6342-1370
Daiwa House Industry Co., Ltd.
Jakarta Office
TEL.+62-21-252-2720
Mobile.
+62-811-1365-977(Masuda)
Mobile.+62-811-1365-972 (Jimichi)
PT.Bekasi Fajar Industrial Estate
Mobile.
+62-81-29467-7005(Asano)